Building the footing
The next step in the process is to build the footing- the bottom of the outer cradle. The total size is 12 …
The next step in the process is to build the footing- the bottom of the outer cradle. The total size is 12 …
It took a lot of work and dedication, but Matrix broke through the bottom of the pool last week. We made careful …
With the holes made by Pro Cut, Matrix was able to reach the floor of the pool directly above the main drain. …
In the efforts to break through the bottom of the pool, we encountered a large patty of concrete poured over the main …
July 6 – The final stage in the preparation for the concrete pouring is to dig down to the bottom of the …
The boys from Matrix took off Friday, July 1st (to avoid the holiday weekend traffic for the drive home, not in honor …
June 29 & 30 – the excavation continues…. Only one day of excavation left! Please support our mikvah project, with either a …