IMG_4076

Solid Walls, Day One

We started hanging the sheet rock today! These guys move quickly, and we’re more than halfway done. G-d Willing the walls should …

IMG_3999

Spray Foam Insulation

We’re preparing to sheet rock the walls, and the final preparation is the spray foam insulation. The outer walls of the reception …

IMG_3763

Plumbing Rough-In

After the walls were framed, while the electrical wires were being laid, we installed the plumbing – the steel vent pipes and …

IMG_3634

Electrical Rough-In

After the rooms were framed out, we began the process of installing the electrical wiring for the lights, outlets, etc. Please support …

IMG_3849

HVAC Installation

We are installing a ductless split HVAC system. It is more cost effective to install, easier to maintain, and sleek and relatively …

IMG_3630

Framing the Rooms

With the concrete all poured, it’s time to start putting up some rooms! First step: frame them up, with metal studs. A …

IMG_3548

Water Testing the System

After the floors were all poured and enough time had passed that the upper trough had cured enough to support its own …

Pouring the Floors

After the troughs were all cured, and the radiantly-heated floors of the mikvah room and prep rooms were cured, we poured the …

mikvah name plaque

Mikvah Mayanei Tovah

We are pleased to announce that our mikvah will be named Mikvah Mayanei Tova in memory of Mrs. Toby Sontag, A”H of …